Alaska · Terra Energy Center Corp

Alaska Carbon Capture Utilization and Storage Coal Commissioning Project

Federal support

Not mapped — location pending

Key facts

1Coal unitsof 382 tracked nationally
250 MWCapacity0.1% of the tracked fleet
—Age of oldest unit
—CO2 in 2025
—SO2 in 2025
—Mercury in 2025
—2025 net generationFigure pending (EIA 923 early release)

Coal vs. clean power

Cost comparison not available for this plant — see methodology.

Units (1)

ExpandTypeStatusRetirement
—Circulating fluidized bed boiler250—Planned—
DOE money